NCLH Subport DevelopmentCurrently, the NCLH marine and dock design has been a concept-level understanding of likely development in the vicinity of the NCLH “Subport” property, considering future development at the westerly side, extending just beyond Gold Creek, and extending easterly to the Seadrome Building and Dock, managed by Goldbelt. To understand the range of maritime uses likely over the next …
Skagway Brewing Company
Skagway Brewing CompanySkagway Brewing Company’s new facility is one of the largest of its kind in Alaska. The facility is three levels and just above 18,000sf of restaurant, two bars, merchandise store, industrial brewing area, aeroponics grow room, and office space. This large project needed to carefully fit into Skagway’s Historic District. Complicated building code requirements such as attaching to …
Dawson Construction Office Building
Dawson Construction Office BuildingDawson Construction asked MRV to complete renovation design for their new headquarters located in Juneau. Dawson acquired an old metal building seeing potential and approached MRV on making it a reality. The renovation brings together the Dawson yard, prefabrication shop and office together on one property. The building includes office space, large conference rooms, and an additional …
Evergreen Building
Evergreen BuildingThe Evergreen Building was awarded LEED Silver in 2008, and was the first private building in Alaska toearn LEED certification. Commissioned and designed by MRV President Paul Voelckers, the project was acomplete remodel of an existing medical office. The structure now has a second story, two commercialground floor office spaces, and three high-end apartments upstairs. This building -our own- …
Soldotna Visitor Center
Soldotna Visitor CenterMRV initially worked with the Foraker Group to conceptually study and cost estimate a Visitor Center for Soldotna. MRV Architects has assisted on this project through Programming, Conceptual Design, and Schematic Design. The overall size totals 9,800 sf. with an 1,800 sf. alternative including a large primary meeting and ballroom space, smaller break-out spaces, including an active lobby/foyer …
Kasaan Eco-lodge
Kasaan Eco-lodgeMRV Architects and our engineering team have completed full construction documents for a cultural facility and eco-lodge for the Organized Village of Kasaan, a small Haida village on the eastern shore of Prince of Wales Island. Funding for construction has not yet been secured. The 15,300 sq.ft building has two stories and a partial basement, located on a prominent …
Alaska Ocean Center
Alaska Ocean CenterThe Alaska Ocean Center is a proposed facility to be located on the site of the old “Subport”, a prime piece Juneau waterfront adjoining the Coast Guard Facilities in the “Willoughby District” downtown. The property, currently owned by Alaska Mental Health Land Trust, has long been identified for prime waterfront development. The proposed design is a single-story facility, …
Instructional Arts Campus, Sealaska Heritage Institute
Instructional Arts Campus, Sealaska Heritage Institute MRV Architects has performed Schematic design for a proposed Arts Instructional Campus for the Sealaska Heritage Institute. This innovative project will transform an existing surface parking lot at a key location in Downtown Juneau fronting the Walter Soboleff Building into a multi-use arts plaza. Proposed improvements would provide a combination of open space, covered …
Northrim Bank Ketchikan
Northrim Bank KetchikanMRV renovated this site Ketchikan for Northrim Bank. Back to Portfolio
Icy Strait Point
Icy Strait PointMRV Architects was hired by Huna Corporation to provide conceptual site planning and detailed building design for comprehensive expansions to their visitor facilities at Icy Strait Point, just outside of Hoonah. The new site plan and building additions were central to a major expansion around a new deep-draft cruise ship dock, which substantially increased the number of visitors …
- Page 1 of 2
- 1
- 2